Roof Replacement in Bournemouth & Poole
Four kinds of roof replacement, all stripped back and rebuilt properly rather than covered over. Pick the one that matches your house and we will walk you through how the job runs.
ServiceTiled Roofs
The most common replacement around here. Concrete or clay tiles, stripped back to the rafters and relaid on new felt and battens.
Learn more
ServiceSlate Roofs
Natural and fibre cement slate. Heavier, longer lasting, and less forgiving of a bad fix, so the detailing matters more.
Learn more
ServiceNew Build Roofs
A roof on a property that has never had one. Built from the felt up to the drawings and to current building regulations.
Learn more
ServiceExtension Roofs
Tying a new roof into an existing one. The join is where these leak, so that is where the work goes.
Learn more
What is included on every replacement
Whichever covering you pick, this is the same.
Scaffold before anything else
Erected first, every time. Nobody works off a ladder on a strip, and it is what lets us work safely above your house and your neighbours.
The timbers get checked
While the roof is open we look at the rafters and battens underneath. If something is rotten you hear about it then, not after it has been covered up.
Proctor Air breathable felt
New membrane on every replacement. It lets moisture out of the roof space instead of trapping it against the timbers.
Dry ridge and dry verge
Ridge and hip tiles fixed mechanically rather than bedded on sand and cement. Mortar cracks and works loose. Dry systems do not.
A 15 to 20 year guarantee
Issued on every roof we install, once the job is signed off. If something goes wrong inside that period you call us and we come back out.
The site cleared properly
Waste taken away and the ground swept before we leave. You should not be finding old nails in the lawn next spring.
Roofs we have replaced
Our own work, across Bournemouth, Poole and the towns around them.
Captions name the covering used and the town.
How a replacement runs
One to two weeks on most houses, depending on the size of the roof.
We look at the roof properly
Up on the roof, not squinting from the pavement. Then we tell you what we have found and whether it genuinely needs replacing.
Scaffold up, materials delivered
Scaffold is erected first and the materials come to site, so once we start the job runs straight through.
Strip the old covering
The old tiles or slates come off and the timbers underneath get checked while they are exposed. We work in sections so the roof is never open overnight.
Felt, battens and new covering
Proctor Air breathable felt, new battens, then the new tiles or slates laid to manufacturer spec.
Ridge, hips and flashing
Dry ridge on the ridge and hips, and the lead details around chimneys, valleys and abutments. This is the part that decides whether a roof leaks.
Clear up and guarantee
Scaffold comes down, waste goes, the site is swept and your guarantee is issued.
What customers say
We are a new company and we are building this up honestly. These are the jobs people have been kind enough to comment on.
Sam Young
Southern Counties Roofing completed a full re roof for me. I was very pleased with outcome and there professionalism. Would deffo recommend.
Kris Pass
Great job, thanks guys. Would highly recommend.
Clive Curley
Nice guys to deal with and a good price a1
Tile or slate, and what the difference actually means
Most replacements come down to these two. Here is the honest version, including where tile is the better buy.
| Concrete or clay tile | Slate | |
|---|---|---|
| Typical lifespan | 40 to 60 years | 60 to 100 years on natural slate |
| Cost to install | Lower | Higher, on both material and labour |
| Weight on the roof | Heavy, and the structure is usually built for it | Heavy, and a change from tile needs the timbers checking |
| Repairs later on | Tiles are easy to source and swap | Matching an older slate can be difficult |
| Looks right on | Most post-war housing around Poole and Bournemouth | Period property, and anywhere slate is already the local look |
| Our honest take | The right answer on most houses we quote | Worth it where the property already has it |
Swipe to see every column
When a roof actually needs replacing
A roof needs replacing when the covering has reached the end of its life across the whole roof, not when one part of it has failed. That distinction is worth money to you, because the two get quoted very differently.
The signs that point at replacement are consistent: tiles shedding their surface across the whole roof rather than in one patch, felt that has perished so daylight shows through in the loft, repeated repairs in different places over a few years, and sagging that follows the line of the rafters. One slipped tile is not any of those.
The signs that point at repair are just as clear. Water coming in around a chimney, a valley or an abutment is usually a flashing problem, and flashing can be replaced without touching the rest of the roof. Loose ridge tiles are a re-bedding job. A handful of cracked tiles on a covering that is otherwise sound is a morning's work.
We have quoted plenty of roofs where the honest answer was a repair, and we have said so. That is the whole reason people call us back. If the job needs doing, then it needs doing, but nobody is getting sold a roof they do not need.
Questions about roof replacement
How much does a roof replacement cost?
It depends on the size of the roof, its pitch, how much access it needs and what we find when the covering comes off. A bungalow and a three storey semi are not the same job. We would rather come and look at it and give you a real figure than quote a range down the phone.
How long will it take?
One to two weeks on most houses. Bigger or more complicated roofs take longer, and weather can move it, but we will tell you the expected run before we start.
Can I stay in the house while the work is done?
Yes. It is noisy while the strip is happening and there will be scaffold up for the duration, but the house stays watertight and you do not need to move out.
Do I need planning permission to replace my roof?
Not usually. Replacing like for like on a normal house is generally permitted development. It changes if the property is listed or in a conservation area, and we do not take on listed or heritage roofing, so we would point you to a specialist for those.
Will you check the timbers underneath?
Yes, while the roof is open. If a rafter or batten has gone we tell you at that point and price the repair separately, rather than covering it up and leaving it for the next roofer to find.
What happens if it rains halfway through?
We strip and re-cover in sections rather than opening the whole roof at once, so there is always a way to make it watertight at the end of the day. If the weather turns badly we stop and sheet it up.
- Service
Flat Roofing
Garages, dormers, porches and extensions. GRP, EPDM and torch-on felt.
Learn more - Service
Roof Repairs
Leaks, storm damage and ridge work, where a replacement is not the answer.
Learn more - Service
Chimneys & Leadwork
Flashing, valleys, chimney repairs, rebuilds and removals.
Learn more - Service
Roofline & Guttering
Fascias, soffits, bargeboards, guttering and downpipes.
Learn more
Where we replace roofs
Based in Bournemouth, working across the conurbation and the towns just outside it.
Find out whether your roof needs replacing
We will come and look at it, tell you what we find, and give you a straight answer either way.
Get a free quote
Tell us what you need and we'll come back with a price. No pressure, no hard sell.
Prefer to talk? Call Southern Counties Roofworks Ltd on 07895 305286
